網站首頁技術中心 > CD-800 Dicing Machine               Instruction
產品目錄
CD-800 Dicing Machine               Instruction
更新時間:2013-07-29 點擊量:3940

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

主站蜘蛛池模板: 男女啪动最猛动态图| 欧美日韩一区二区观看| 国产kkk777在线观看一区| 国产成人人综合亚洲欧美丁香花| 欧美一区二区三区a∨| 欧美一区二区三区四| 人妻一区日韩二区国产欧美| 人人妻人人澡人人爽不卡视频| 精品动漫福利h视频在线观看| 中文字幕无码乱人妻| 日本xxxx色视频在线观看| 亚洲日韩国产一区二区三区在线| 免费国产一区二区三区四区| 天美传媒精品1区2区3区| 国产精品一品二区三区的使用体验| 欧美亚洲另类 丝袜综合网| 欧洲无码精品a码无人区| 久久一区二区三区人妻av| 亚洲丁香婷婷久久一区二区| 欧美日韩在线视频| 东京热久久综合久久88| 手机在线亚洲国产精品| 97se亚洲国产综合在线| 欧洲亚洲国产成人综合色婷婷| 精品人妻伦一二三区久久| 国产超级va在线观看视频| 日本高清视频在线一区二区| 国产日韩欧美一区二区在线高清| 色哟哟精品视频在线观看| 国产二区交换配乱婬| 免费无码又爽又刺激毛片| 97无码人妻福利免费公开在线视频 | 美女扒开大腿让男人桶| 国产午夜片无码区在线观看爱情网 | 亚洲一级片在线观看一区二区三区| 麻豆国产精品一区二区三区| 欧美成人精品午夜免费影视 | 国产无套护士在线观看| 国产精品伦一区二区三级视频| 亚洲日韩精品欧美一区二区| 熟睡人妻被讨厌的公侵犯|